Deliverable 6.6 Report on the impact of PtG on selected scenarios
Deliverable 6.6 Report on the impact of PtG on selected scenarios This Deliverable presents the results obtained by investigating the interaction between the future electricity transmission system and the Power-to-Gas (PtG) technology. In the framework of the project STORE&GO, Work Package 6 (WP6) focused on the modelling and simulation of PtG into the electricity system, […]
Deliverable 6.7 Final report “PtG grid integration experiments”
Deliverable 6.7 Final report “PtG grid integration experiments” This Deliverable focused in particular on how to integrate the information about the facilities replicating the real world condition into a simulation environment. For doing this, the concept of remote Physical Hardware-in-the-Loop (PHIL) has been used and exploited. Remote simulation with physical hardware appears to be an […]
Deliverable 5.9 Final report on evaluation of technologies and processes
Deliverable 5.9 Final report on evaluation of technologies and processes The report presents the technical as well as the economic evaluation of the three different demo sites. Therefore, the system boundaries are carefully chosen and performance indicators are defined within the project. To test the long term stability and the load flexibility of the demo […]
Deliverable 6.5 Real time implementation of grid models
Deliverable 6.5 Real time implementation of grid models This Deliverable is focused in particular on how to integrate the information about the facilities replicating the real world condition into a simulation environment. For doing this, the concept of Remote Hardware-in-the-loop (RHIL) has been exploited. Remote simulation with physical hardware appears to be an effective means […]
Deliverable 6.4 Report on the model of the power system with PtG
Deliverable 6.4 Report on the model of the power system with PtG The Deliverable presents different network models aiming to properly represent both the transmission and distribution grids and tries to answer the impact on the operation of the system of integrating PtG and the impact of PtG on the electricity grid development. In particular, […]
Deliverable 6.3 Impact Analysis and Scenarios design
Deliverable 6.3 Impact Analysis and Scenarios design This Report evaluates over 120 scenarios based on a parametric variation of 22 parameters that are related either to the system (e.g. CO2 storage) or the technology (e.g. PtM Capex). Out of those 120 scenarios 55 were selected for more detailed analysis. This allowed the researchers to identify […]
Deliverable 6.1 Report on opportunities and options for PtG in the power system
eliverable 6.1 Report on opportunities and options for PtG in the power system This report aims to investigate the role of Power-to-Gas (PtG) in the electrical system, in particular drawing its possible use in the different sectors of the ES (Electricity System). Since one of the partners involved has special expertise in the operation of […]